Electrical installation: 1 meter system 63A, sub-distribution, KNX installation, 58 m wall channel, 3 intercoms and bell systems, signage system, fire brigade system, 88 LED built-in lights, 74 LED tub lights, security lighting system with LED inlay and LED tub lights, 6 mast lights, 8 outdoor wall lights, approx. 160 m
Heating installation: 2 LW pumps, 1 gas condensing boiler, approx. 500 m
Ventilation installation: heat recovery unit 4 500 m³/h, heat recovery unit 2,500 m³/h, 4 individual fans, exhaust exhaust system, approx. 75 mg/h. Oval tube, approx. 230 m g. Spiral rebate pipe, ca. 17 m
Sanitary installation: 14 WT systems, 11 toilets, 1 reservoir -WC system, 5 shower systems, approx. 60 m PE sewer pipes, approx. 230 m composite drinking water pipeline; water treatment system, compressed air system.
Electrical installation work
Plumbing work
Heating equipment installation
Ventilation installation work.