The services mainly include:
1.topographic trajectory measurements within built-up areas:
- width to be measured up to 15 m,
- width to be measured up to 25 m,
- width to be measured up to 35 m,
- width to be measured up to 50 m,
2.topographic trajectory measurements outside built-up areas:
- width to be measured up to 15 m,
- width to be measured up to 25 m,
- width to be measured up to 35 m,
- width to be measured up to 50 m,
3. topography of sites or parcels;
4. additional measurements as a supplement to a performed or existing measurement;
5. legal boundary provisions;
6. drawing up expropriation plans;
7.topographic trajectory measurements of structures:
- under bridge to be measured,
- upper bridge to be measured,
8. direction work by land surveyor;
9. direction work by topographer.
Lot 1: assignments for AWV West Flanders (WWV)The services mainly include:
1.topographic trajectory measurements within built-up areas:
- width to be measured up to 15 m,
- width to be measured up to 25 m,
- width to be measured up to 35 m,
- width to be measured up to 50 m,
2.topographic trajectory measurements outside built-up areas:
- width to be measured up to 15 m,
- width to be measured up to 25 m,
- width to be measured up to 35 m,
- width to be measured up to 50 m,
3. topography of sites or parcels;
4. additional measurements as a supplement to a performed or existing measurement;
5. legal boundary provisions;
6. drawing up expropriation plans;
7.topographic trajectory measurements of structures:
- under bridge to be measured,
- upper bridge to be measured,
8. direction work by land surveyor;
9. direction work by topographer.
Lot 2: assignments for AWV East Flanders (WOV)The services mainly include:
1.topographic trajectory measurements within built-up areas:
- width to be measured up to 15 m,
- width to be measured up to 25 m,
- width to be measured up to 35 m,
- width to be measured up to 50 m,
2.topographic trajectory measurements outside built-up areas:
- width to be measured up to 15 m,
- width to be measured up to 25 m,
- width to be measured up to 35 m,
- width to be measured up to 50 m,
3. topography of sites or parcels;
4. additional measurements as a supplement to a performed or existing measurement;
5. legal boundary provisions;
6. drawing up expropriation plans;
7.topographic trajectory measurements of structures:
- under bridge to be measured,
- upper bridge to be measured,
8. direction work by land surveyor;
9. direction work by topographer.