Plumbing.
Main building:
- 503 m soundproof sewer pipe DN40-150;
- 788 m stainless steel pipe DN12-40 (drinking water);
- 2x treatment Toilet (1xWC, 1xWT);
- 6x WC women (2x WC, 2x WT);
- 5x toilets men (1xWC, 1xUR, 2xWT);
- 1x WC women (4x WC, 3xWT);
- 1x toilet men (2xWC, 3x UR, 3rd WT);
- 7x shower at floor level;
- 1x sewage lifting system - installation in the pump sump.
Outbuildings:
- 133 m soundproof sewer pipe DN40-100;
- 325 m stainless steel pipe DN12-40 (drinking water);
- 2x treatment Toilet (1x toilet, 1xWT);
- 4x pers. Toilet (1xWC, 1xWT);
- 6x WT in adjoining rooms.