The regional school with a full-time primary school in Proseken is expanded. The existing single-storey primary school and after-school care building has reached its capacity limit and will be replaced by a new building.
In the future, 416 pupils will be able to attend the school, with the capacity of the primary school increasing to 208 places and the after-school care centre being available to 154 children.
A 2-storey building is planned for the new construction of the primary school and after-school care building. Each floor consists of a class cluster and an after-school care cluster, which are connected by a central access zone with cloakrooms and sanitary zones. The clusters, in turn, each consist of 4 large group or classrooms as well as associated smaller differentiation rooms, which are grouped around an open learning and recreation zone.
The new connecting building between the primary and regional schools will be 1-storey. It connects the new building of the primary school with the existing building of the canteen and the secondary regional school.
The new buildings are mainly planned as a wooden construction.
The existing secondary regional school will only be rebuilt in some areas. A new elevator system is planned. The existing house alarm system will be expanded to include the new building. For the energy supply of the new building, a connection to the existing plant is assumed, which must be weighed up in the course of further planning. A ventilation concept is required for the new buildings. On the roof of the primary school there is a PV system for coverage
of the company's own electricity requirements.
In connection with the construction project, the outdoor facilities for the primary school and after-school care area are to be redesigned and redesigned. The same applies to the forecourt area in the north-east – the new entrance area.
The subject of the award procedure is the specialist planning services for structural engineering in accordance with § 51 ff. HOAI 2021 for the expansion and renovation of the regional school with primary school in Proseken.
The service is to be commissioned in stages as follows.
Stage 1: LPH 1-3
Level 2: LPH 4-6
plus the special services required in each stage.
Initially, level 1 is commissioned. The right to assign the other levels is reserved and is carried out by separate written notification.