The municipality of Weßling intends to build a new primary school building for all of its 3 districts using wood.
The main building comprises a slope floor / basement, the ground floor and an upper floor (= top floor).
The following services are mainly awarded with this ticket: Plasterboard work.
Generally:
New construction of a 2-storey school with an outbuilding in timber construction with HBV ceilings
with basement and staircase cores in reinforced concrete
Floor area 80x20m, GFA 195m2/BRI 530m3,
Interior walls plasterboard/ drywall work
600 m2 Supplementing load-bearing wooden walls on both sides with external planking and insulation
1170 m2 double stud walls, wall height up to 6.50 m
300 m2 simple stand walls
250 m2 installation walls and facing shells
250 m2 plasterboard suspended ceilings in damp rooms
Installation of suspended ceilings made of HWL acoustic panels with insulation material overlay
250 m2 acoustic ceiling UG suspension on reinforced concrete ceiling
1150 m2 acoustic ceiling ground floor with suspension on timber structure and HBV ceiling
200 m2 acoustic ceiling, outdoor space F30
1160 m2 acoustic ceiling between supporting structure in the sloping ceilings (ceiling height from 3.50 to 7.50 m)
250 m2 acoustic ceiling outdoor space outbuilding with wooden substructure