Execution of cleaning work in the tunnels in the course of the BAB44 and B27 in the area of the East Hesse Operations 2020-2022.
Cleaning area = 3.50 m height:
- Pre-cleaning of the tunnel walls using a high pressure water jet approx. 51 520.00 m;
- application of cleaning agents;
- Main cleaning of the tunnel walls by means of equipment carrier with tunnel washing machine (rotating brushes) approx. 50 700.00 m;
- Rinsing the tunnel walls with at least 180 bar approx. 50 700.00 m;
- Clean emergency walkways using a spray bar approx. 50 700.00 m;
- cleaning the road approx. 192 520.00 m
- Clean tunnel facility 2 184 pieces