The primary school on Brinkmannstrasse in Bremen-Hemelingen is a two-tier primary school and a W + E (perception and development-delayed) location. It is to be expanded into an all-day primary school. For this, both renovation measures in the existing building and a new building / extension of a cafeteria are required.
For reasons of monument protection, the new canteen is to be built behind the building so that the appearance of the elementary school on the entrance side is not changed. The school (including the basement) currently has a gross floor area of around 3,500 m
Construction costs (KG 300 + 400) of approx. EUR 3.9 million net are estimated for the overall measure.
- Object planning building Lph 1-2, optional Lph 3-9 acc. Section 34 HOAI i. V. m. Appendix 10 number 10.1.
Special / additional services:
- demolition planning of sections of the existing building in the area of the new cafeteria,
- Inventory (special service for LPH 1 of the object planning building according to § 34 HOAI),
- optional: necessary in-depth price check (special service for LPH 7 of the building planning according to § 34 HOAI),
- optional: keeping a construction diary according to RLBau (special service for LPH8 of the object planning building according to § 34 HOAI),
- optional: tracking of the elimination of defects as proof upon request (special service for LPH 9 of the building project planning according to § 34 HOAI).