Construction of the infrastructure of the Szczecin Central Cemetery Stop (Towards the Sun). Extension of Władysława Sikorskiego Street with technical infrastructure as part of task 3.2.A: Construction of interchanges and interchange stops with equipment related to the integration of transport on railway lines 273, 351, 401 and 406 as part of the Construction of the Szczecin Metropolitan Railway using existing sections of railway lines No. 406, 273, 351.
1. The subject of the order includes “The implementation of the infrastructure of the Stop Szczecin Central Cemetery (Ku Słoiec). Expansion of Władysław Sikorski Street with technical infrastructure within the framework of task 3.2.A: Construction of interchanges and switching stops together with equipment related to the integration of transport on railway lines 273, 351, 401 and 406 under the construction of the Szczecin Metropolitan Railway with using existing sections of railway lines number 406, 273, 351.”
2. The subject of the order includes the construction and reconstruction of road infrastructure within the railway stop - Szczecin Central Cemetery (Ku Słoiec) in particular: demolition of existing construction structures, construction of the exit from the roadway of Władysław Sikorski street, construction of maneuver roadway, construction and reconstruction of the pavement, construction of the street lighting network, reconstruction of the power cable line SN-15kV, construction of the power cable line nn-0.4 kV WLZ (internal supply line), construction of electricity cable sewer nn-0.4 kV, construction of telecommunications sewerage system, reconstruction of a gas pipeline connection, construction of a water supply connection, construction of elements of small architecture (such as: information pylon, bicycle rack, waste baskets, SIP boards, benches), felling of trees and shrubs, construction of fencing, stand management and spatial execution layout of greenery in the area of the intersection of Sikorski and Ku Słoiec streets in Szczecin.
3. Detailed description of the object of the contract include: the contract template of Annex 2 to the SWZ, the design documentation of Annex 4 to the SWZ, the technical specifications for the performance and acceptance of works constituting Annex 5 to the SWZ and the Table of Billing Elements, Annex No. 6 to SWZ.