The construction project comprises the civil engineering work for the pipeline laying for the entire geothermal network. The network comprises a total of 13 geothermal probes, which are used in the marketplace. The cables are grouped together at the distribution shaft in the marketplace and led into the building.
Approximately 250 m³ excavation for the trenches, about 320 m