Construction of an aeronautical maintenance hangar and a control tower
Work contracts under formalized procedure for the construction of a maintenance hangar and a control tower on the Châteauroux-Déols Airport. This same operation is also the subject of another concomitant consultation for works contracts under adapted procedure.
Lot 1: earthworks - VRD
Earthworks VRD.
Lot 7: doubling partitions - false ceilings - control tower
Partitions dubbing false ceilings.
Lot 8: interior joinery - raised floors - control tower
Interior carpentry false floors.
Lot 9: Floor coverings - wall finishes - control tower
Floor coverings wall finishes.
Lot 10: elevator - control tower
Elevator.
Lot 11: structural work - metal frame - shed
Structural work metal frame.
Lot no 12: roofing - waterproofing - cladding - exterior joinery - locksmithing - hangar
Roof waterproofing cladding exterior joinery locksmith.
Lot 13: Low Current and High Current Electricity - Hangar
Electricity.
Lot 15: large doors - shed
Big doors.