The object of the procurement is a framework agreement agreement for civil engineering design and construction services.
Framework agreements are drawn up for three years from the signing of the contract, with an option option of one year.
Planning and Expert Services (TKA) of Public AreasSub-area tasks (1-6):
1. planning and expert tasks of streets and other public areas
2. General and network planning and dimensioning of water supply in connection with spatial planning
3. Planning wastewater and stormwater pumping stations in connection with spatial planning
4. dimensioning, planning, etc. related to stormwater management.
5. Road planning
6. Design of sports areas, playgrounds and other park areas
In their tender, the tenderer must present experience (for company references) for all tasks 1-6. The tenderer must have experience of at least tasks 1-4 (company references). The experience provided by the tenderer in relation to the set of tasks may not be a minor part of the work in question. references (company references). To complete tasks 5 and 6, the tenderer may use a sub-consultant if necessary. In the case of sub-consultants, the requirements of 11.1–11.5 for their own work entity and the requirements of item 12 must be met.
Transport Engineering (LTK)Sub-area tasks (1-5):
1. rakennettavuusselvitykset in.
2. Geotechnical design of earthworks, wires, pipes and associated structures
3. Design of excavations and, for example, their supports
4. Soil and bedrock surveys
5. Planning and studies related to groundwater management and protection
In its tender, the tenderer must present experience (for company references) for all tasks 1-5. The tenderer must have experience of at least tasks 1-4 (company references). The experience provided by the tenderer in relation to the set of tasks may not be a minor part of the work in question. references (company references). To complete task 5, the tenderer may use a sub-consultant if necessary. In the case of sub-consultants, the requirements of 11.1–11.5 for their own work entity and the requirements of item 12 must be met.
Geotechnical and Geotechnical Terrain Surveys (GEOT)Sub-area tasks (1-5):
1. Traffic surveys, forecasts and calculations
2. Economic and operational comparisons of transport
3. Planning of transport networks, systems and transport management
4. Traffic control and guidance planning
5. Expert tasks in public transport
The tenderer must have experience in all work packages (company references). Experience related to a set of tasks cannot be a minor part of a company's or person's reference. A sub-consultant cannot be used to meet the experience requirements of the job packages.
Landscape Design (MAS) SubdivisionSub-area assignments (1-2);
1. Landscape management, planting and restoration plans
2. Design of public outdoor spaces, recreational areas and routes
The tenderer must have experience in all work packages (personal and company references). Experience related to a set of tasks cannot be a minor part of a company's or person's reference. A tenderer cannot use a sub-consultant to meet the experience requirements of the job packages.
Infrastructure Development (i-RAP) sub-areaSub-area assignments (1-5);
1. Construction and supervision of infrastructure projects
2. Tasks related to the preparation and support of the procurement process
3. Duties of the safety coordinator
The tenderer must have experience in all work packages (company references). Experience related to a set of tasks cannot be a minor part of a company's or person's reference. A tenderer cannot use a sub-consultant to meet the experience requirements of the job packages.
Contaminated sites (PIMA) subdivisionSub-area assignments (1-3)
1. Surveys and surveys of contaminated land and water areas
2. Refurbishment planning
3. Supervision of remediation
The tenderer must have experience in all work packages (company references). Experience related to a set of tasks cannot be a minor part of a company's or person's reference. A tenderer cannot use a sub-consultant to meet the experience requirements of the job packages.
Measurement and Mapping Technology (MKT) sub-areaSub-area tasks (1-4)
1. Topographic surveys and measurements
2. työmaamittaukset
3. processing of measurement data to make it suitable for design
4. maatutkaus
The tenderer must have experience of all work packages, except for the completion of task package 4, the tenderer may use a sub-consultant (company references) if necessary. Experience related to a set of tasks cannot be a minor part of a company's or person's reference. A tenderer cannot use a sub-consultant to meet the experience requirements of the job packages.
Bridge and Other Skill Structures (SIT) SubdivisionSub-area assignments (1-2);
1. Design and expert services
2. kuntokartoitukset
The tenderer must have experience in all work packages (company references). Experience related to a set of tasks cannot be a minor part of a company's or person's reference. To meet the experience requirements of the job packages, the provider cannot use a sub-consultant
Environmental planning (CAP) componentSub-area assignments (1-2);
1. Noise and vibration surveys and related design
2. Environmental reports
The tenderer must have experience in all work packages (company references). Experience related to a set of tasks cannot be a minor part of a company's or person's reference. A tenderer cannot use a sub-consultant to meet the experience requirements of the job packages.