A new year-round swimming pool is to be built as a combined family and leisure pool at the site of the existing Bergkamen-Weddinghofen wave open-air swimming pool (Freizeitstätte Im Häupen, Häupenweg 25, 59192 Bergkamen). For this purpose, the delivery and installation of
Façade insulation with top plaster put out to tender as a thermal insulation composite system.
supply and install approx. 45 m2 of mineral wool insulation d= 180 mm,
supply and install approx. 150 m2 of XPS perimeter insulation d= 100 mm,
Deliver and install approx. 200 m2 of fabric inlay and finishing plaster