Ludwig Maximilian University, Großhadern Campus
New ICON building
Operational installations (carpentry work) for a laboratory building with 6 full storeys and a basement, building height approx. 27 m and intermediate construction (bridge construction) to another building with 5 full storeys, building height approx. 22 m; work and assembly planning, work and assembly planning, 7 pcs built-in wardrobes in total approx. 100 m2, partly non-combustible, approx. 225 m2 wall cladding, partly non-combustible, 10 pcs wood-based doors, of which 2 pcs sliding doors, approx. 54 m2 of acoustically effective ceiling cladding, 3 pcs built-in wardrobes as airlock equipment, a total of approx. 27 m2, and 3 pcs sitover benches (HPL solid core material), 3 pcs bar tables, 27 pcs stools, 1 pc. sofa with 2 sofa tables, 1 kitchenette length approx. 4.10 m, 4 pcs desks, 1 pc secretarial furniture with counter, 8 pcs benches, 5 m work tables, 2 pcs blackout curtains in total approx. 9 m