The adoption of track works (Tracks) mainly consists of:
Track section:
a. Bottom line
Preparing the yard zone for carrying out the works;
The burglary and construction of railway equipment in main rail;
The burglary and construction of railway bars, sleepers and ballast in main rail;
b. All kinds
The shifting of tracks and rail devices;
Excavation of soil and ballast;
The collection, unloading and processing or sifting of ballast;
Construction of service roads and service transitions;
Performing aluminothermal welding;
Delivering logistical performance;
Cablework;
Breaking out and (re) laying out flooring in and around the tracks;
The setting and breaking down of temporary speed signals;
Trading of various track materials;
Acquisition of various (outbreak) (rail) materials;
Provision of hydraulic crane and truck with operator;
Making available to qualified railway workers;
Signaling adjustment work section:
The necessary signal-setting works for the realization of a navette service during the temporary line interruption in 2023;
The outbreak of the existing signal installation in the yard zone of the change overchange:
- Outbreak for recuperation of axle counters with corresponding junction boxes;
- Outbreak for recuperation and disposal of alternators;
- To prevent damage to the cables to be reused, these are temporarily withdrawn outside the yard zone;
- Removal and removal of decommissioned cables, slotted work and distribution boxes;
- Outbreak of signal boards and corresponding posts;
The reconstruction of the signal installation in the yard zone of the change renewal:
- Work to enable the placement of signal cables, such as slotting, drawing wells and crossing;
- Drafting distribution boxes;
- Unrolling and placing cables in slots and tubes;
- The introduction and connection of cables to the gears in chain and distribution boxes, as well as to the axle counters and alternators in the rail;
- The muffling of (existing) cables;
- Adjusting the additional indications to existing signals;
- Placing signboards on stilts;
- The realization of backflow connections;
- Cleaning up and bringing the cable route back to an orderly state.
The Catenary (Catenary) adoption consists mainly of:
The complete break-up and renewal of the overhead lines at the level of the far-trakking Y.Oost-Ledeberg. It concerns both traces of L.50, L50E and L58 (1) at this location.
The installation of new overhead line posts and supporting structures;
The break-up of the old catenary;
Placing the new overhead line;
The break-up of the old overhead line posts and supporting structures.