Lot 7 Insulation
1 psch construction site equipment, 3 superstructures; 1 psch Obtaining permits for the use of public services Traffic area, 3 superbuildings; 1 psch Traffic safety at construction sites when using public transport Traffic area, 6 pcs dust protection sill hatches ; 15 m³ rubble container for mixed residual waste. ; 1 psch old insulation in the Drempel area, remove and dispose of Kamilit, approx. 1479 m²; 434 m Creation of green surfaces in the roof space, width = usually 0.60 m ; 1759 m² Insulation of the top floor ceiling ; 18 St Creation of building clearance tenants' basement; Remove 60 m of basement box superstructures; 1486 m² basement ceiling insulation dowelled;