Coupling transformer UW Kerzers, 27MVA, 16.7 Hz

The SBB frequency converter plant in Kerzers is being renewed and expanded. In the course of this renewal, 2 new 132 / 66kV dome transformers will be procured. These two transformers will first be installed at the FU Kerzers plant.

The delivery of the transformers is planned for May 2022.

The delivery includes production, FAT, transport, unloading, assembly and SAT of two 132 / 66kV coupling transformers. Both transformers are delivered and installed at the Kerzers FU plant. The subsequent move to the Sargans substation is not part of the scope of delivery.

Connection cables and connections on the OS or US side are also not included.

We will carry out a plant inspection in the Sargans substation on September 15, 2020 at 10 a.m.

Meeting point:

Entrance to the Sargans substation, Ragazerstrasse 63, 7320 Sargans

Registration, with the name of the person and company taking part, must be sent to the following e-mail by 12.00 p.m. on September 14, 2020: purchase.energie@sbb.ch.

The SBB frequency converter plant in Kerzers is being renewed and expanded. In the course of this renewal, 2 new 132 / 66kV dome transformers will be procured. These two transformers will first be installed at the FU Kerzers plant.

The delivery of the transformers is planned for May 2022.

The delivery includes production, FAT, transport, unloading, assembly and SAT of two 132 / 66kV coupling transformers. Both transformers are delivered and installed at the Kerzers FU plant. The subsequent move to the Sargans substation is not part of the scope of delivery.

Connection cables and connections on the OS or US side are also not included.

We will carry out a plant inspection in the Sargans substation on September 15, 2020 at 10 a.m.

Meeting point:

Entrance to the Sargans substation, Ragazerstrasse 63, 7320 Sargans

Registration, with the name of the person and company taking part, must be sent to the following e-mail by 12.00 p.m. on September 14, 2020: purchase.energie@sbb.ch.

Download full details as .pdf
The Buyer:
SBB AG Infrastruktur Einkauf Energie
CPV Code(s):
31170000 - Transformers