Execution of stage construction works. In the new cafeteria/auditorium, a truss construction and installation of rails for the stage curtain are to be erected above the stage.
Approx. 26m truss construction with 2 corners, 2 T-connectors and 2 headstocks. Approx. 17m motorized wire rope rail for curtain, approx. 8.5m manual wire rope rail for curtain