Fast Way - New road construction, BA 2a - traffic facilities and road bridge BW 203 and noise barrier BW 813
Fast Way - New road construction, BA 2a - traffic facilities and road bridge BW 203 and noise barrier BW 813
Masses approx,;
- Road construction and media
- 2420 m3 of topsoil, removal and storage
- 8490 m2 topsoil 10 cm cover
- 5750 m2 of asphalt pavement up to 24 cm
- 270 m2 of asphalt pavement up to 12 cm
- Picking up and transporting 3690 m3 of unbound base courses
- Pick up and dispose of 715 m of concrete curb
- 8860 m2 of subgrade production
- 8220 m3 of soil loosening and transporting
- Carry out 3820 m3 soil replacement
- 30.000 m3 Dammschüttung
- 7700 m3 Überlastschüttung
- 4850 m3 Vorlastschüttung
- 10,100 m2 of geotextile installation
- Install 10,100 m2 of gravel seepage layer
- 375 m of troughs
- 1020 m Making Banquet
- 510 m3 of coarse-grained soil supply and installation
- 1 concrete shaft DN 1000
- 2 concrete shafts DN 1200
- 1 concrete shaft DN 2000
- 90 m vitrified clay pipes up to DN 600 Stz
- 100 m plastic pipes up to DN 160 PP
- Produce 2930 m3 of frost protection layer 0/32
- 6820 m2 of gravel base course 0/32, 15 cm
- Produce 1020 m2 of ballast base course 0/32, 30 cm – 40 cm
- 5330 m2 of asphalt base course AC 32 TS 14 cm
- Produce 1260 m2 of asphalt base course AC 32 TS 12 cm
- Produce 200 m2 of asphalt base course AC 22 TN 8 cm
- 5310 m2 of asphalt binder course AC SMA 16 BS 8 cm
- Produce 5530 m2 asphalt surface course SMA 11 S 4 cm
- 1260 m2 Asphaltdeckschicht AC 11 DN 4 cm repair
- 200 m2 Asphaltdeckschicht AC 8 DN 3 cm repair
- Produce 170 m2 surface course without binder
- 8500 m2 Rasenansaat
- 2420 m Längsmarkierung
- 535 m of protective equipment
- 520 m of natural curbs set granite
- Manufacture 49 m bus board
- 10 m2 Blindenleitsystem
- 385 m2 concrete paving
- 620 m DN 110 PE cable conduit with earthworks
Building 203
- 10.4300 m3 Baugrubenaushub Dammschüttung
- 7310 m3 Hinterfüllung
- 470 m of in-situ concrete bored piles D = 150 cm
- 62 t reinforcing steel for bored piles D = 150 cm
- 550 m3 reinforced concrete foundation C 35/45
- 990 m3 reinforced concrete abutment C 35/45
- 8 pcs prefabricated parts C 45/55
- 150 m3 reinforced concrete superstructure C 40/45
- 60 m3 reinforced concrete cap C25/30
- 318 t reinforcing steel B 500 B
- 7 t prestressing steel St 1660/1860
- 48 m Stahlgeländer
- 470 m2 waterproofing - bitumen welding membrane
- 270 m2 Asphaltschutzschicht
- 100 m granite curb
- manufacture 100 m of protective equipment
Building LSW 813
- Deliver 360 m3 of soil
- 290 m of in-situ concrete bored piles D = 70 cm
- 19 t reinforcing steel for bored piles D = 70 cm
- 362 m2 of aluminium wall elements
- 350 m2 Wandsockel
- 12 t reinforcing steel for plinth
- Manufacture 100 pcs posts for noise barrier