The subject of the contract is: "Execution for the period from 2023 to 2027 of periodic inspections of engineering structures administered by the Branch in Krakow, divided into three parts"
Periodic inspections of 2 bridge structures over the Vistula River in Krakow at km 2+079 of expressway No. S7o (eastern bypass of Krakow) in 2023-2027The order includes periodic inspections in accordance with the rules applicable to the basic, extended and detailed road engineering structures specified in chapters III and IV of the "Instructions for conducting road inspections of engineering structures" annexed to the Ordinance No. 35 of the General Directorate for National Roads and Motorways of 28 September 2020, referred to as the "Inspection Instruction".
During inspections, the Contractor is obliged to apply the recommendations contained in the inspection and operation instructions developed by manufacturers and contractors of bridge structure and equipment elements, constituting an attachment to Volume III SWZ (OPZ), as well as detailed guidelines contained in Volume III SWZ (OPZ).
Periodic inspections of the bridge over the Dunajec River in Kurowo at km 55+610 of national road No. 75 (local km 75b – 0+538) in 2023-2027The order includes periodic inspections in accordance with the rules applicable to the basic, extended and detailed road engineering structures specified in chapters III and IV of the "Instructions for conducting road inspections of engineering structures" annexed to the Ordinance No. 35 of the General Directorate for National Roads and Motorways of 28 September 2020, referred to as the "Inspection Instruction".
During inspections, the Contractor is obliged to apply the recommendations contained in the inspection and operation instructions developed by manufacturers and contractors of bridge structure and equipment elements, constituting an attachment to Volume III SWZ (OPZ), as well as detailed guidelines contained in Volume III SWZ (OPZ).
Periodic inspections of the tunnel under Luboń Mały in Naprawa at km 23+993 of the S7b expressway in 2023-2027The order includes periodic inspections in accordance with the rules applicable to the basic, extended and detailed road engineering structures specified in chapters III and IV of the "Instructions for conducting road inspections of engineering structures" annexed to the Ordinance No. 35 of the General Directorate for National Roads and Motorways of 28 September 2020, referred to as the "Inspection Instruction".
During inspections, the Contractor is obliged to apply the recommendations contained in the inspection and operation instructions developed by manufacturers and contractors of bridge structure and equipment elements, constituting an attachment to Volume III SWZ (OPZ), as well as detailed guidelines contained in Volume III SWZ (OPZ).