Repair of the corrosion protection on the cable structure and the underside of the carriageway as well as renewal of the carriageway crossings, repair and cleaning work on the Rodenkirchen Rhine bridge in Cologne.
- Renew approx. 104 m of carriageway crossings (noise-related steel lamellar construction with 9 lamellas, sealing profiles with traverses, force-controlled);
- approx. 2,300 m
- Corrosion protection work on the cable structure (approx. 7,900 m hanger and suspension cable length) and the underside of the carriageway (approx. 29,600 m
- Traffic management on the building;
- scaffolding;
- Repair work equipment and signage;
- approx. 800 m
- approx. 300 m