The construction project essentially comprises the following services:
- Demolition work (asphalt, substructure) approx. 435 m²
- Excavation and soil removal (breaking, loosening, transporting, disposing of including verification) approx. 3500 m³
- Produce grade approx. 4600 m²
- Subsoil compaction approx. 4600 m²
- Geotextil GRK 3 (200g/m²) ca. 3100 m²
- Soil improvement work (make and compact layer thickness 30 cm) approx. 520 m³
- Produce frost protection layer (layer thicknesses 0.33m / 0.35m) approx. 470 m³
- Produce ballast base course (layer thickness 0.15 m) approx. 150 m³
- Produce hydraulically bonded base course 0/32 (layer thicknesses 0.15 to 0.22 m) approx. 30 m³
- Asphalt surface 4 cm approx. 1150 m²
- Produce asphalt binder layer 6 cm approx. 550 m²
- Produce asphalt binder layer 8 cm approx. 600 m²
- Asphalt base course 10 cm approx. 1150 m²
- Manufacture on-board system approx. 19.5 m
- Make gutter approx. 18 m
- Reinforced concrete culvert DN 300 laying approx. 55 m
- Dismantle and reinstall crash barriers approx. 86 m
- Rasenansaat ca. 2,700m²