The contract covers design and performance studies, supply of installations and equipment, setting up and assembly work, connections, commissioning, advance use of parts of the installation, finalisations, testing and carrying out functional and performance checks on the technical installations, supply of sets of spare parts and special tools for 1 centralised emergency exit control unit (UGCIS), as defined in Annex A to French standard NF CMSI S 61-934, as well as for 3 operational assistance units.
It also covers all necessary services for dismantling, and returning to the EP, existing installations and materials (excluding controllers/modules and cabling) when not used.
Training of operating staff and system administrators, as well as full maintenance during the warranty period are also included.