the purpose of this consultation is the deconstruction of buildings as part of the rehabilitation of the Spanish barracks. 4 distinct tranches:Tf: Building 20 (3 weeks)to001: Buildings 12, 13, 21, 22 annex boiler room and fence walls East and South right bank (8 weeks)to002: Building 07 and annex, fence wall South left bank (12 weeks)to003: Building 17 (4 weeks)in case of recovery of the tranches in time, the minimum overall duration planned for the execution of all the services is 27 weeks (i.e. 189 calendar days)
the purpose of this consultation is the deconstruction of buildings as part of the rehabilitation of the Spanish barracks. 4 distinct tranches:Tf: Building 20 (3 weeks)to001: Buildings 12, 13, 21, 22 annex boiler room and fence walls East and South right bank (8 weeks)to002: Building 07 and annex, fence wall South left bank (12 weeks)to003: Building 17 (4 weeks)in case of recovery of the tranches in time, the minimum overall duration planned for the execution of all the services is 27 weeks (i.e. 189 calendar days)