L192 bike path Öhningen-Wangen
Asphalt and civil engineering:
(about 1600m bike path, about 400 m road construction including cross help)
- loosen soil load and recycle approx. 2 000 m
- Carry out a qualified soil improvement approx. 7 000 m
- Production of trenches about 1 300 m
- manufacture of prefabricated shafts approx. 32 pieces,
- lay approx. 1 250 m seepage pipe,
- FSS Geh and bike path make about 2 500 m
- FSS roadway about 1 800 m
- Asphalt layers roadway produce approximately 4 200 m
- asphalt layers walk and cycle path 5 000 m
- manufacture of shelves and borders about 1 900 m,
- Trench construction 1 200 m.
Engineering:
(Seven supporting structures)
- construction of seven supporting structures,
- Production of angular support walls made of in-situ concrete, l ges = approx. 130 m, h max = approx. 1.50 m,
- Production of retaining wall made of in-situ concrete, l ges = 310 m, foundation,
- Rammrohrpfähle, l ges piles = about 1 070 m,
- Production of nailed sprayed concrete wall with facing shell, approx. 500 m
- Setting of wall slabs l ges = about 50 m, h = 0.45 - 2.30 m.