Cluster III LK Karlsruhe: Establishment of an NGA network including house connection management and construction of house connections on the municipalities and clients Oberhausen-Rheinhausen, Ubstadt-Weiher, Östringen, Karlovy Vary
Lot 1 — Oberhausen-Rheinhausen Gewerbegebiet WeiherwegThe aim of this call for tenders is to hire qualified companies (hereinafter referred to as contractors) with the expansion described below. The expansion and coordination services to be taken over by the contractor are to be carried out in close coordination with the municipality (hereinafter referred to as client) and with the BLK up to and including the execution planning.
The construction works advertised hereby extend the existing municipal fiber optic infrastructure with a consistent and functional fiber optic network for all residential and commercial buildings to be connected in the specified expansion areas. After commissioning, the expansion should take place within one year if possible (schedule - chapter 4 attachment task description). The client wishes to start construction at short notice after placing the order.
The subject of the call for tenders includes:
- Preparation of all necessary planning (e.g. approval and execution planning including all necessary preparatory work) for laying micropipe assembankments based on the master plan.
- laying of microear dressings including all necessary civil engineering work.
- manufacture of house branches from micropipe dressings and laying individual pipes to buildings, including building entry in the development area
- supply and installation of fiberglass splitter housings (KvZ 82), as well as the introduction of cables and pipes
- House connection management including obtaining the land use agreement (GNV)
- supply and installation of fibre-optic closures (APL) in buildings
- delivery and installation of a POP in Oberhausen including all ancillary work
- delivery and assembly of all necessary optical components in POP stations (e.g. splice patch modules)
- supply and feeder of fiber optic cables
- splicing
- Preparation and update of a binding schedule, as well as coordination of the construction time plan. The construction time plan is part of the contract.
- Regular jour fixed dates and coordination of construction with the municipality and the BLK.
- Acceptions including function tests must be carried out together with the client.
- quality assurance and documentation of all work carried out
The following apply to the provision of services:
- Grander's specifications (see chapter 5, appendix, task description and attachments 1 - 7)
- description of the expansion area (see chapter 3 annex task description)
- Schedule (see chapter 4 appendix task description)
- Service obligations (see chapter 6 appendix task description)
- Uniform material concept, CCM-BLK product catalog and cable and splice concept IKZ-LKKA (will be provided further)
- FTTB master plan (will be provided further)
- stock plans of existing conduits, current status (will be made available in the further process)
- Location description for POP (will be provided further)
Everything else can be found in the task description that is fully referenced in the system.
Lot 2 — Ubstadt-Weiher FTTB/H connection schoolsThe aim of this call for tenders is to hire qualified companies (hereinafter referred to as contractors) with the expansion described below. The expansion and coordination services to be taken over by the contractor are to be carried out in close coordination with the municipality (hereinafter referred to as client) and with the BLK up to and including the execution planning.
The construction works advertised hereby extend the existing municipal fiber optic infrastructure with a consistent and functional fiber optic network for all residential and commercial buildings to be connected in the specified expansion areas. After commissioning, the expansion should take place within one year if possible (schedule - chapter 4 attachment task description). The client wishes to start construction at short notice after placing the order.
The subject of the call for tenders includes:
- Create all necessary planning (e.g. approval and execution planning including all necessary preparatory work) for laying micropipe associations based on the FTTB structure plan.
- laying of microear dressings including all necessary civil engineering work.
- manufacture of house branches from micropipe dressings and laying individual pipes to buildings, including building entry in the development area
- supply and installation of fiberglass splitter housings (KvZ 82), as well as the introduction of cables and pipes
- supply and feeder of individual tubes into stock pipes DA160
- House connection management including obtaining the land use agreement (GNV)
- supply and installation of fibre-optic closures (APL) in buildings
- delivery and installation of a POP at the town hall Odenheim including all ancillary works
- delivery and assembly of all necessary optical components in POP stations (e.g. splice patch modules)
- supply and feeder of fiber optic cables
- splicing
- Preparation and update of a binding schedule, as well as coordination of the construction time plan. The construction time plan is part of the contract.
- Regular jour fixed dates and coordination of construction with the municipality and the BLK.
- Acceptions including function tests must be carried out together with the client.
- quality assurance and documentation of all work carried out
The following apply to the provision of services:
- Grander's specifications (see chapter 5, appendix, task description and attachments 1 - 7)
- description of the expansion area (see chapter 3 annex task description)
- Schedule (see chapter 4 appendix task description)
- Service obligations (see chapter 6 appendix task description)
- Uniform material concept, CCM-BLK product catalog and cable and splice concept IKZ-LKKA (will be provided further)
- FTTB breakdown structure (will be provided in the further process)
- stock plans of existing conduits, current status (will be made available in the further process)
- Location description for POP (will be provided further)
Everything else can be found in the task description that is fully referenced in the system.
Lot 3 — Östringen-Odenheim business parks Brühl und BreitwiesenThe aim of this call for tenders is to hire qualified companies (hereinafter referred to as contractors) with the expansion described below. The expansion and coordination services to be taken over by the contractor are to be carried out in close coordination with the municipality (hereinafter referred to as client) and with the BLK up to and including the execution planning.
The construction works advertised hereby extend the existing municipal fiber optic infrastructure with a consistent and functional fiber optic network for all residential and commercial buildings to be connected in the specified expansion areas. After commissioning, the expansion should take place within one year if possible (schedule - chapter 4 attachment task description). The client wishes to start construction at short notice after the order has been placed. Due to funding requirements, 06.01.2022 is the latest possible date for the start of construction and therefore mandatory by the winning bidder as a contractor.
The subject of the call for tenders includes:
- Preparation of all necessary planning (e.g. approval and execution planning including all necessary preparatory work) for laying micropipe assembankments based on the master plan.
- laying of microear dressings including all necessary civil engineering work.
- manufacture of house branches from micropipe dressings and laying individual pipes to buildings, including building entry in the development area
- supply and installation of fiberglass splitter housings (KvZ 82), as well as the introduction of cables and pipes
- supply and feeder of individual tubes into stock pipes DA160
- House connection management including obtaining the land use agreement (GNV)
- supply and installation of fibre-optic closures (APL) in buildings
- delivery and installation of a POP at the town hall Odenheim including all ancillary works
- delivery and assembly of all necessary optical components in POP stations (e.g. splice patch modules)
- supply and feeder of fiber optic cables
- splicing
- Preparation and update of a binding schedule, as well as coordination of the construction time plan. The construction time plan is part of the contract.
- Regular jour fixed dates and coordination of construction with the municipality and the BLK.
- Acceptions including function tests must be carried out together with the client.
- quality assurance and documentation of all work carried out
The following apply to the provision of services:
- Grander's specifications (see chapter 5, appendix, task description and attachments 1 - 7)
- description of the expansion area (see chapter 3 annex task description)
- Schedule (see chapter 4 appendix task description)
- Service obligations (see chapter 6 appendix task description)
- Uniform material concept, CCM-BLK product catalog and cable and splice concept IKZ-LKKA (will be provided further)
- FTTB master plan (will be provided further)
- stock plans of existing conduits, current status (will be made available in the further process)
- Location description for POP (will be provided further)
Everything else can be found in the task description that is fully referenced in the system.
Lot 4 — Östringen-Odenheim SchulstraßeThe aim of this call for tenders is to hire qualified companies (hereinafter referred to as contractors) with the expansion described below. The expansion and coordination services to be taken over by the contractor are to be carried out in close coordination with the municipality (hereinafter referred to as client) and with the BLK up to and including the execution planning.
The construction works advertised hereby extend the existing municipal fiber optic infrastructure with a consistent and functional fiber optic network for all residential and commercial buildings to be connected in the specified expansion areas. After commissioning, the expansion should take place within one year if possible (schedule - chapter 4 attachment task description). The client wishes to start construction at short notice after the order has been placed; due to funding requirements, September 22, 2022 is the latest possible date for the start of construction and therefore mandatory by the winning bidder as a contractor to adhere to.
The subject of the call for tenders includes:
- Preparation of all necessary planning (e.g. approval and execution planning including all necessary preparatory work) for laying micropipe assembankments based on the master plan.
- laying of microear dressings including all necessary civil engineering work.
- manufacture of house branches from micropipe dressings and laying individual pipes to buildings, including building entry in the development area
- supply and installation of fiberglass splitter housings (KvZ 82), as well as the introduction of cables and pipes
- supply and feeder of individual tubes into stock pipes DA160
- House connection management including obtaining the land use agreement (GNV)
- supply and installation of fibre-optic closures (APL) in buildings
- delivery and installation of a POP at the town hall Odenheim including all ancillary works
- delivery and assembly of all necessary optical components in POP stations (e.g. splice patch modules)
- supply and feeder of fiber optic cables
- splicing
- Preparation and update of a binding schedule, as well as coordination of the construction time plan. The construction time plan is part of the contract.
- Regular jour fixed dates and coordination of construction with the municipality and the BLK.
- Acceptions including function tests must be carried out together with the client.
- quality assurance and documentation of all work carried out
The following apply to the provision of services:
- Grander's specifications (see chapter 5, appendix, task description and attachments 1 - 7)
- description of the expansion area (see chapter 3 annex task description)
- Schedule (see chapter 4 appendix task description)
- service obligations (see chapter 6 appendix description of tasks)
- Uniform material concept, CCM-BLK product catalog and cable and splice concept IKZ-LKKA (will be provided further)
- FTTB master plan (will be provided further)
- stock plans of existing conduits, current status (will be made available in the further process)
- Location description for POP (will be provided further)
Everything else can be found in the task description that is fully referenced in the system.
Lot 5 — Östringen FTTB/H connection schoolsThe aim of this call for tenders is to hire qualified companies (hereinafter referred to as contractors) with the expansion described below. The expansion and coordination services to be taken over by the contractor are to be carried out in close coordination with the municipality (hereinafter referred to as client) and with the BLK up to and including the execution planning.
The construction works advertised hereby extend the existing municipal fiber optic infrastructure with a consistent and functional fiber optic network for all residential and commercial buildings to be connected in the specified expansion areas. After commissioning, the expansion should take place within one year if possible (schedule - chapter 4 attachment task description). The client wishes to start construction at short notice after the order has been placed. Due to funding requirements, 27.01.2022 is the latest possible date for the start of construction and therefore mandatory by the winning bidder as a contractor to adhere to.
The subject of the call for tenders includes:
- Preparation of all necessary planning (e.g. approval and execution planning including all necessary preparatory work) for laying micropipe assembankments based on the master plan.
- laying of microear dressings including all necessary civil engineering work.
- manufacture of house branches from micropipe dressings and laying individual pipes to buildings, including building entry in the development area
- supply and installation of fiberglass splitter housings (KvZ 82), as well as the introduction of cables and pipes
- House connection management including obtaining the land use agreement (GNV)
- supply and installation of fibre-optic closures (APL) in buildings
- delivery and assembly of all necessary optical components in POP stations (e.g. splice patch modules)
- supply and feeder of fiber optic cables
- splicing
- Preparation and update of a binding schedule, as well as coordination of the construction time plan. The construction time plan is part of the contract.
- Regular jour fixed dates and coordination of construction with the municipality and the BLK.
- Acceptions including function tests must be carried out together with the client.
- quality assurance and documentation of all work carried out
The following apply to the provision of services:
- Grander's specifications (see chapter 5, appendix, task description and attachments 1 - 7)
- description of the expansion area (see chapter 3 annex task description)
- Schedule (see chapter 4 appendix task description)
- Service obligations (see chapter 6 appendix task description)
- Uniform material concept, CCM-BLK product catalog and cable and splice concept IKZ-LKKA (will be provided further)
- FTTB master plan (will be provided further)
- stock plans of existing conduits, current status (will be made available in the further process)
- Location description for POP (will be provided further)
Everything else can be found in the task description that is fully referenced in the system.
Lot 6 — Karlovy Vary ittersbach FTTB/H connection schoolsThe aim of this call for tenders is to hire qualified companies (hereinafter referred to as contractors) with the expansion described below. The expansion and coordination services to be taken over by the contractor are to be carried out in close coordination with the municipality (hereinafter referred to as client) and with the BLK up to and including the execution planning.
The construction works advertised hereby extend the existing municipal fiber optic infrastructure with a consistent and functional fiber optic network for all residential and commercial buildings to be connected in the specified expansion areas. After commissioning, the expansion should take place within one year if possible (schedule - chapter 4 attachment task description). The client wishes to start construction at short notice after the order has been placed. Due to funding requirements, 27.01.2022 is the latest possible date for the start of construction and therefore mandatory by the winning bidder as a contractor to adhere to.
The subject of the call for tenders includes:
- Preparation of all necessary planning (e.g. approval and execution planning including all necessary preparatory work) for laying micropipe assembankments based on the master plan.
- laying of microear dressings including all necessary civil engineering work.
- manufacture of house branches from micropipe dressings and laying individual pipes to buildings, including building entry in the development area
- supply and installation of fiberglass splitter housings (KvZ 82), as well as the introduction of cables and pipes
- House connection management including obtaining the land use agreement (GNV)
- supply and installation of fibre-optic closures (APL) in buildings
- delivery and assembly of all necessary optical components in POP stations (e.g. splice patch modules)
- supply and feeder of fiber optic cables
- splicing
- Preparation and update of a binding schedule, as well as coordination of the construction time plan. The construction time plan is part of the contract.
- Regular jour fixed dates and coordination of construction with the municipality and the BLK.
- Acceptions including function tests must be carried out together with the client.
- quality assurance and documentation of all work carried out
The following apply to the provision of services:
- Grander's specifications (see chapter 5, appendix, task description and attachments 1 - 7)
- description of the expansion area (see chapter 3 annex task description)
- Schedule (see chapter 4 appendix task description)
- Service obligations (see chapter 6 appendix task description)
- Uniform material concept, CCM-BLK product catalog and cable and splice concept IKZ-LKKA (will be provided further)
- FTTB master plan (will be provided further)
- stock plans of existing conduits, current status (will be made available in the further process)
- Location description for POP (will be provided further)
Everything else can be found in the task description that is fully referenced in the system.