Development of project documentation along with author's supervision (option right) as part of the project entitled: "Reconstruction of the demolished railway line No. 198 Pyskowice –
Pyskowice City for the restoration of the connection on the route Katowice – Gliwice – Pyskowice City" implemented as part of the Programme for Supplementing Local and Regional Railway Infrastructure – Railway + until 2029
The website where changes and explanations of the content of the SWZ and other procurement documents directly related to the procurement procedure will be made available: https://platformazakupowa.plk-sa.pl in the subtab dedicated to the subject procedure No. 9090/IREZA4/02584/00616/23/P available in the "Current", "In progress" or "Resolved" tab (depending on the stage of the proceedings).
The subject of the Order is:
• in the basic scope (Phase I) development of design documentation as part of the project "Reconstruction of the demolished railway line No. 198 Pyskowice – Pyskowice City to restore the connection on the route Katowice – Gliwice – Pyskowice City"
• within the scope of the Right of Option (Phase II), performing author's supervision during the duration and acceptance of construction works.
The Order Processing Period is 1353 days:
1) Phase I – 578 calendar days from the date of signing the contract;
2) Phase II (Option Right) - from the day following the date of conclusion by the Contracting Authority of the contract with the contractor of construction works until the last final acceptance; This time is defined at 622 calendar days
3) between Phase I and Phase II there will be a tendering procedure with an estimated duration of 153 days.
A detailed description of the subject of the Order can be found in Volume III SWZ - "OPZ".