Energetic and General Rehabilitation Evangelical Secondary School Magdeburg
Fill unevenness and depressions 450 m 2 Ground the ground 270 m 2 Fill niches with insulation 700 m 2 Mask windows and exterior doors with foils
- 620 m 2 Building diagnostics Structural waterproofing 200 m 2 Fillet, bituminous,
- 204 m perimeter insulation panels 147 m 2 Constructive protection of the seal,
- 104 m EPS base training,
- 50 m sealing slurry flexible,
- 50 m mounting system for light suspensions + light installations per 20 pieces 3-D fabric strip,
- seal 730 m connecting joints,
- 420 m sheet connection profile,
- 27 m plaster finish profile,
- 220 m mineral wool insulation board,
- 1 700 m 2 Glueing wall protection plate Uncoupling doweling Insulation plate Cutouts f Pipes Manufacture Cutouts Insulation Soffits Expansion joint profile Screw dowel Fabric angle profile Reinforcement Cement base Plastering v Reveals, felts and lintels Plaster base Primer coat Mineral paint, top coat Close center anchor holes.
Fill unevenness and depressions 450 m 2 Ground the ground 270 m 2 Fill niches with insulation 700 m 2 Mask windows and exterior doors with foils - 620 m 2 Building diagnostics Structural waterproofing 200 m 2 Fillet, bituminous,
- 204 m perimeter insulation panels 147 m 2 Constructive protection of the seal,
- 104 m EPS base training,
- 50 m sealing slurry flexible,
- 50 m mounting system for light suspensions + light installations per 20 pieces 3-D fabric strip,
- seal 730 m connecting joints,
- 420 m sheet connection profile,
- 27 m plaster finish profile,
- 220 m mineral wool insulation board,
- 1 700 m 2 Glueing wall protection plate Uncoupling doweling Insulation plate Cutouts f Pipes Manufacture Cutouts Insulation Soffits Expansion joint profile Screw dowel Fabric angle profile Reinforcement Cement base Plastering v Reveals, felts and lintels Plaster base Primer coat Mineral paint, top coat Close center anchor holes.