Stadtwerke Rheine intend to build a new indoor pool at the existing outdoor pool on Kopernikusstrasse.
- Basement: approx. 2,060 m
- Ground floor: approx. 3,350 m
- Upper floor: approx. 895 m
- Total: approx. 6 305 m
- approx. 1 750 m
- approx. 200 m
- various helpers;
- Facade planning with structural verification.