Project and design preparation, estimation of costs | Tenderlake

Project and design preparation, estimation of costs

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
02 September 2019
Closing Date:
08 October 2019
Location(s):
ITC15 Novara (IT Italy/ITALIA)
Description:
Technical and economic feasibility study, final design as well as the executive design option, safety coordination in the design phase and execution of works and DL

Assignment of the technical and economic feasibility study, final design as well as the executive design option, safety coordination in the design and execution phase and construction supervision for the construction of the navigation basin at Porto della Torre in the Municipality of Varallo Pombia (NO ).

Assignment of the technical and economic feasibility study, final design as well as the executive design option, safety coordination in the design and execution phase and construction supervision for the construction of the navigation basin at Porto della Torre in the Municipality of Varallo Pombia (NO ) - CUP B45B18013040002 - CIG 7986328E57.

Download full details as .pdf
The Buyer:
Agenzia Interregionale per il fiume Po — AIPo — Parma
CPV Code(s):
71242000 - Project and design preparation, estimation of costs