Assignment of the technical and economic feasibility study, final design as well as the executive design option, safety coordination in the design and execution phase and construction supervision for the construction of the navigation basin at Porto della Torre in the Municipality of Varallo Pombia (NO ).
Assignment of the technical and economic feasibility study, final design as well as the executive design option, safety coordination in the design and execution phase and construction supervision for the construction of the navigation basin at Porto della Torre in the Municipality of Varallo Pombia (NO ) - CUP B45B18013040002 - CIG 7986328E57.