Studies and works on a global project consisting of:
- installation of a temporary school (10 classes) on the "M2" plot,
- demolition of Anne Frank Kindergarten,
- reconstruction / expansion of the Anne Frank Kindergarten at the same site with 4 additional classes (nursery school of 12 classes, currently 8 classes) and construction of a joint restoration for the two Anne Frank and Marie Curie schools,
- HVAC maintenance and operation of the temporary school, the Anne Frank Kindergarten and the joint catering as of their respective receptions and up to 2 years after the reception of Anne Frank Kindergarten,
- double certification of Anne Frank "Bepos" and "HQE" kindergarten.
Studies and works on a global project consisting of:
- installation of a temporary school (10 classes) on the "M2" plot,
- demolition of Anne Frank Kindergarten,
- reconstruction / expansion of the Anne Frank Kindergarten at the same site with 4 additional classes (nursery school of 12 classes, currently 8 classes) and construction of a joint restoration for the two Anne Frank and Marie Curie schools,
- HVAC maintenance and operation of the temporary school, the Anne Frank Kindergarten and the joint catering as of their respective receptions and up to 2 years after the reception of Anne Frank Kindergarten,
- double certification of Anne Frank "Bepos" and "HQE" kindergarten. The envelope set for the operation (MOE studies and works) of the overall project is estimated at EUR 14,300,000 excluding taxes.