Trockenbauarbeiten.
— approx. 350m2 metal stud walls with fire protection and sound insulation requirements,
— approx. 160m2 attachment shells,
— approx. 45m steel column cladding,
— approx. 60m2 front Open and close walls and end shells for installation,
- Create about 16 door openings,
- approx. 60 inspection flaps in walls,
— approx. 370m2 GK blankets,
- approx. 50 inspection flaps in ceilings.
Get our periodical newsletter about how sell more to the public sector and how to make the most of Tenderlake.