- Approx. 1160 m copper pipeline (DN12 - DN25) incl. shut-off and regulating valves
- Approx. 290m copper pipeline (DN35 – DN40)
- Approx. 1450 m of aluminium-laminated insulation 100% (up to DN40)
- 3 pcs glandless pump DN25 for heating coil ventilation units incl. mixing valve
- 63 pcs radiator as heating wall horizontal (H: 620mm; L: up to 2000mm)
- 12 pcs radiators as heating wall vertically (H: up to 2000mm; L: up to 950mm)
- Approx. 130 m² underfloor heating with 1 FBH distributor
- 2 pcs connection to existing heating system (HK and FBH)
- Winter construction heating with connection to existing heating system
- Approx. 1160 m copper pipeline (DN12 - DN25) incl. shut-off and regulating valves
- Approx. 290m copper pipeline (DN35 – DN40)
- Approx. 1450 m of aluminium-laminated insulation 100% (up to DN40)
- 3 pcs glandless pump DN25 for heating coil ventilation units incl. mixing valve
- 63 pcs radiator as heating wall horizontal (H: 620mm; L: up to 2000mm)
- 12 pcs radiators as heating wall vertically (H: up to 2000mm; L: up to 950mm)
- Approx. 130 m² underfloor heating with 1 FBH distributor
- 2 pcs connection to existing heating system (HK and FBH)
- Winter construction heating with connection to existing heating system