38 E 80338 - FLI Mariensee / Mecklenhorst
Permanent placement of the FLI in ME/MA
Cluster 4 - Heating and cooling systems
Heat supply systems Cluster 4 for the construction of a new research complex for the Friedrich Loeffler Institute.
Heat supply via a local heating connection from the central heat supply system of the property for 2 existing buildings and a new building. Heating distributions in the buildings and panel radiators as well as steel radiators. For the new building with canteen, library, social area and administration, there is also a heating circuit for an air conditioning system and a heating circuit for drinking water supply. Supply of the buildings with split cooling.