Metal construction work - Kern Ost.
Metal construction work on all floors, in the stairwell, the core and in installation shafts.
The work is carried out in partial areas of the respective floors and on each floor. There may be short-term interruptions in the work between the construction phases.
The work takes place during ongoing operations. Noisy work must not be carried out between 9:00 a.m. and 5:00 p.m.
19 pieces of steel glass elements F30 deliver and assemble, 28 pieces of sheet metal facing surfaces of floor ceilings produce, supply and install aluminum powder-coated, 14 pieces of stainless steel railings are made, deliver and install, 10 pieces of steel doors with fire protection requirements are supplied and installed, 360 kg steel construction of the shaft platform , deliver and assemble, 8 pcs. steel railing shaft, galvanized, manufacture, deliver and assemble, deliver and assemble 25 m fire protection sealing cord.
Only personnel who have previously been checked for reliability and have no negative indications may be used to perform the services.
This procedure is under the allocation no. 20-97519. (Please specify when making inquiries).