The OBS Marklohe is comprehensively renovated and expanded.
For this purpose, the existing school building of the OBS Marklohe will be built except for the load-bearing
Reinforced concrete skeleton construction dismantled. The interior layout is restructured to accommodate the new
Space program and to meet the current space requirements. The exterior façade is constructed in a timber panel construction.
Essentially, these are:
5 classroom ventilation ceiling installation 600 m³/h
28 classroom ventilation wall installation 600 m³/h
1 piece central ventilation system 7,000m³/h
1 piece central ventilation system 6,000m³/h
1 piece central ventilation system 6,700m³/h
2 roof exhaust fans 1,100 m³/h
3 plastic roof fans 600 m³/h laboratory exhaust air
400 m² ducts up to 500mm edge length
580 m² fittings up to 500mm edge length
300m Wickelfalzrohr DN 125
60m PPs pipe 200mm
15 fire dampers DN 100
1 piece server cooling 4 kW
The services cover the area of ATV DIN 18379 "Ventilation and air-conditioning systems"
The OBS Marklohe is comprehensively renovated and expanded.
For this purpose, the existing school building of the OBS Marklohe will be built except for the load-bearing
Reinforced concrete skeleton construction dismantled. The interior layout is restructured to accommodate the new
Space program and to meet the current space requirements. The exterior façade is constructed in a timber panel construction.
Essentially, these are:
5 classroom ventilation ceiling installation 600 m³/h
28 classroom ventilation wall installation 600 m³/h
1 piece central ventilation system 7,000m³/h
1 piece central ventilation system 6,000m³/h
1 piece central ventilation system 6,700m³/h
2 roof exhaust fans 1,100 m³/h
3 plastic roof fans 600 m³/h laboratory exhaust air
400 m² ducts up to 500mm edge length
580 m² fittings up to 500mm edge length
300m Wickelfalzrohr DN 125
60m PPs pipe 200mm
15 fire dampers DN 100
1 piece server cooling 4 kW
The services cover the area of ATV DIN 18379 "Ventilation and air-conditioning systems"