Construction of a school group in the Pont de Bois district. As part of its educational policy, but also to support the urban development of the Pont de Bois district, the City of Villeneuve-d'Ascq has started construction work on a school group of five nursery classes and eight classes. elementary schools and a school canteen. This consultation relaunches lot 1: structural work / tiling / earthenware (resumption of the "extended shell" lot stopped) and lot 15: locksmith.
Structural work / tiles / earthenware (resumption of the “extended structural work” lot)The services and works provided for in this lot include:
- lot 01.01: lot resumption of structural work stopped;
- lot 01.02: lot of tiles, earthenware.
LocksmithServices related to exterior carpentry work falling under lot 15 - locksmithing.