Construction of the transmission line of the Purtse wind farm in accordance with the basic documents for public procurement (including “Annex 1 - Volume of works”; “Appendix 2 - Requirements for design and construction work”; “Annex 3 — Electrical and communications installation” (including “Annex 3.1 — Technical requirements” and “Annex 3.2 — Preliminary project”); “Annex 4 - Schedule”; “Annex 5 - Client information”).
The aim of public procurement is to conclude a contract for construction works (see “Appendix 6 - Project of contract contract” and “Appendix 6.1 - General conditions for construction TVL”).
Construction of the transmission line of the Purtse wind farm in accordance with the basic documents for public procurement (including “Annex 1 - Volume of works”; “Appendix 2 - Requirements for design and construction work”; “Annex 3 — Electrical and communications installation” (including “Annex 3.1 — Technical requirements” and “Annex 3.2 — Preliminary project”); “Annex 4 - Schedule”; “Annex 5 - Client information”).
The aim of public procurement is to conclude a contract for construction works (see “Appendix 6 - Project of contract contract” and “Appendix 6.1 - General conditions for construction TVL”).