Renovation of radiology and radiotherapy, S3 component B,C,D/ Lot 141 - Sanitary technology
In the Braunschweig Municipal Hospital, large-scale medical equipment is being replaced in various measures during ongoing operation.
Part of the overall construction project is the construction and extension of an existing sanitary facility (3rd to 6th construction phase). High hygiene standards must be adhered to during construction. As part of the construction project, sanitary objects must be dismantled, then reassembled and extended by additional ones.
Scope of services - KG 410 Sanitary facilities:
- 1 lift
- Stainless steel pipes for drinking water installation
- SML pipes
- PP sewage pipes
- approx. 20 new sanitary items such as toilet and washbasins