The construction task involves the renovation of a listed building in downtown Munich. The renovation is divided into several construction phases. The following specifications refer to the drainage canal work.
Core quantities:
- Packing trenches 100 pieces,
- excavation for pipeline trenches 40 m³,
- Excavation for packing trenches 60 m³,
- Shoring, vertical standard shoring 250 m
- Soil Z0 recycle 10 t,
- dispose of soil Z1.1 10 t,
- dispose of soil Z1.2 10 t,
- dispose of soil Z2 10 t,
- sewer DN 160 PP 50 m,
- Sewer DN 200 PP 20 m.
The construction task involves the renovation of a listed building in downtown Munich. The renovation is divided into several construction phases. The following specifications refer to the drainage canal work.
Core quantities:
- Packing trenches 100 pieces,
- excavation for pipeline trenches 40 m³,
- Excavation for packing trenches 60 m³,
- Shoring, vertical standard shoring 250 m
- Soil Z0 recycle 10 t,
- dispose of soil Z1.1 10 t,
- dispose of soil Z1.2 10 t,
- dispose of soil Z2 10 t,
- sewer DN 160 PP 50 m,
- Sewer DN 200 PP 20 m.