Hias IKS, henceforth referred to as the Contracting Authority, shall construct a new water treatment plant at Nordsveodden in Stange municipality. The project is rooted in the principal plan for water supply for 2010-2022, the current financial plan and the joint municipal sector plan for water and sewage for Hamar, Løten, Ringsaker and Stange municipalities.
This contract includes:
— inlet, main distribution and sub-distributions,
— a back-up power generator, a complete system with automatic coupling and a pump system for fuel,
— conduits; cable ladders and pipes,
— security systems, fire-proofing, emergency light, burglary and access control systems,
— electro technical installations and circuit systems for the operation of the building,
— heater cables and heater.