Expansion of the administrative location of the Görlitz District Office - Lot 19-A Metal construction and locksmith work on old buildings
Retrofit stair railings between wooden railings, 2 steel posts with diamond-shaped steel net fillings stretched between them approx. 100 m²,
Metal fall protection systems with diamond-shaped steel net fillings on the galleries in the hall approx. 40 lfd.m,
Steel banisters with diamond-shaped steel mesh fillings approx. 30 running metres,
Wall handrails made of oak approx. 50 lfd.m
Wall handrails made of stainless steel approx. 40 lfd.m
Ramp railing made of stainless steel 20 lfd.m
Fall protection windows made of steel, powder-coated approx. 100 pcs.
1 pc. refurbishment/completion of historical window grilles