Energetic and General Rehabilitation Evangelical Secondary School Magdeburg
Cleaning the substrate, applying a bonding agent concrete, leveling the substrate concrete, removing plaster overhangs impact sound insulation layer, covering insulation, thermal insulation layer with edge strips approx. 1 200 m 2 Floating cement screed reinforced, CT-C35-F5 approx. 1 000 m 2 Sealing G200S4 approx. 1 200 m 2 Edge strips made of PE, screed repairs Screeds, expansion joint profile, expansion joint profile on door frames, cutting dummy joints and filling.
Cleaning the substrate, applying a bonding agent concrete, leveling the substrate concrete, removing plaster overhangs impact sound insulation layer, covering insulation, thermal insulation layer with edge strips approx. 1 200 m 2 Floating cement screed reinforced, CT-C35-F5 approx. 1 000 m 2 Sealing G200S4 approx. 1 200 m 2 Edge strips made of PE, screed repairs Screeds, expansion joint profile, expansion joint profile on door frames, cutting dummy joints and filling.