B33 new Section E New construction of the Waldsiedlung tunnel, operating technology.
Operational equipment of the Waldsiedlung tunnel including associated structures, operational buildings, the apron areas and the branch offices.
The scope includes the energy supply, production of lighting systems, ventilation systems, traffic systems, security systems, control centers, control technology and tunnel radio.