Road bridge construction work

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
30 November 2021
Closing Date:
26 January 2022
Location(s):
DEE08 Burgenland (DE) (DE Germany/DEUTSCHLAND)
Description:
B 87 OU Bad Kösen BW 7 bat crossing - Tultewitz

B 87 BW 0817, bat crossing, Tultewitz new building

The main services of the construction project are:

Remove and recycle 11200 m3 of soil or rock

Installing 3312 m3 of soil as a building backfill

Produce 46 m plastic pipeline

Install 7 channel duct duct DU 400

Produce 500 m2 of gravel base layer

Produce 500 m2 top layer without binder

Make a 174 m gutter with concrete paving slabs

Setting 97 m concrete curbs

Make a 26 m embankment staircase

Produce 136 m in-situ concrete bored pile

603 m3 of Reinforced Concrete

Produce a sealing layer of 395 m2 from bitumen welding membrane

44 m steel railings