B 87 BW 0817, bat crossing, Tultewitz new building
The main services of the construction project are:
Remove and recycle 11200 m3 of soil or rock
Installing 3312 m3 of soil as a building backfill
Produce 46 m plastic pipeline
Install 7 channel duct duct DU 400
Produce 500 m2 of gravel base layer
Produce 500 m2 top layer without binder
Make a 174 m gutter with concrete paving slabs
Setting 97 m concrete curbs
Make a 26 m embankment staircase
Produce 136 m in-situ concrete bored pile
603 m3 of Reinforced Concrete
Produce a sealing layer of 395 m2 from bitumen welding membrane
44 m steel railings