Cogeneration plant construction work | Tenderlake

Cogeneration plant construction work

Contract Value:
EUR 8M - 8M
Notice Type:
Contract Notice
Published Date:
24 March 2023
Closing Date:
22 May 2023
Location(s):
ITH35 Venezia (IT Italy/ITALIA)
Description:
PPP for executive design construction of trigeneration plant operation and maintenance served by Fusina purification plant

Public-Private Partnership for the assignment of the executive design, construction, operation and maintenance of a trigeneration plant served by the Fusina purification plant belonging to Veritas SpA. pursuant to Article 183, paragraph 15, of Legislative Decree no. 50/2016 as amended, on the basis of the proposal submitted by a private subject whose data are better specified in the tender documents.

Public-Private Partnership for the assignment of the definitive and executive design, installation, operation and maintenance of a trigeneration plant served by the Fusina purification plant belonging to Veritas SpA, pursuant to Article 183 paragraph 15 of Legislative Decree 50/2016 of the Code of Public Contracts. The Contracting Authority bases the tender with the Technical-Economic Feasibility Study that has been prepared by the Promoter, with respect to which the Competitor must propose improvements that will be developed through the preparation of a Final Project to be presented in the tender by the Bidder. The Competitor, to whom the tender procedure will be awarded, must draw up the executive and construction project on the basis of the Final Project in line with the Technical-Economic Feasibility Study. In addition to the design, the successful tenderer will have to carry out and carry out the installation and subsequently maintenance of a trigeneration plant served by the Fusina purifier.

Download full details as .pdf
The Buyer:
Gruppo Veritas
CPV Code(s):
45251220 - Cogeneration plant construction work
45259000 - Repair and maintenance of plant