Engineering services

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
10 June 2020
Closing Date:
10 July 2020
Location(s):
DEA38 Warendorf (DE Germany/DEUTSCHLAND)
Description:
City of Warendorf, realization of the city street north, 3rd construction phase - civil engineering bridge and structural design bridge

Lot 1:

Basic services in the service profile of engineering structures according to § 43 HOAI 2013 i. V. m. Annex 12 HOAI 2013 for service phases 5-9 (bridge)

Special performance: Local site management

Special achievement: adapting the design planning

There is a gradual assignment. First, the basic services of the Lph are commissioned. 5 to 6 according to § 43 HOAI 2013.

Lot 2:

Basic services in structural engineering according to § 51 HOAI i. V. m. Appendix 14 HOAI for service phases 2-6.

There is a gradual assignment. First, the basic services of the Lph are commissioned. 2 to 4 according to § 51 HOAI 2013.

Civil engineering bridge

The city of Warendorf plans to carry out the third phase of construction of the north city street. In addition to a road construction length of about 1.5 km, a bridge with a span of approx. 73 m is being built over the Ems. This requires engineering planning (Lot 1). Structural engineering services are assigned to lot 2.

In 1996 the city of Warendorf commissioned the engineering planning office with the planning of a northern city street as a collecting street, which was to take over all source and destination traffic in the north of Warendorfer, with the aim of relieving the north of Warendorf from road traffic.

The project was secured under planning law by drawing up development plan no. 1.58 "Nördliche Stadtstraße". Furthermore, as part of the plan justification in 1997, a landscape maintenance plan was drawn up by the engineering planning office.

The first two construction phases of the Northern Street have already been completed by the city of Warendorf. The first construction phase connects via a roundabout in the east of the city of Warendorf to the federal road 475 and the state road 830 / "Sassenberger Straße". The second phase of construction links west of the city of Warendorf at the entrance to the town via a roundabout to Landesstraße 830 / "Milter Straße".

The planned third construction phase represents the final construction phase in the realization of the planned northern city street in the north of the city of Warendorf. The third construction phase serves to fill the gap and connects the sections already built in the connection area Landesstraße 830 / "Milter Straße" with the connection to the federal road 64 over the existing street "Hellegraben".

When planning, the results of the species protection report, the species protection test and the FFH compatibility test etc., as well as the other documents attached as annex, must be taken into account.

Structural engineering bridge

The city of Warendorf plans to carry out the third phase of construction of the north city street. In addition to 1.5 km of road construction, there is also a new bridge with a span of approx. 73 m over the Ems. Structural planning is required for this (lot 2). The engineering structure is the subject of lot 1. In 1996, the city of Warendorf commissioned the engineering planning office with the planning of a northern city street as a collecting street, which was to take over the entire source and destination traffic of the north of Warendorf, with the aim of closing the north of Warendorf from road traffic relieve.

The project was secured under planning law by drawing up development plan no. 1.58 "Nördliche Stadtstraße". Furthermore, as part of the plan justification in 1997, a landscape maintenance plan was drawn up by the engineering planning office.

The first two construction phases of the Northern Street have already been completed by the city of Warendorf. The first construction phase connects via a roundabout in the east of the city of Warendorf to the federal road 475 and the state road 830 / "Sassenberger Straße". The second phase of construction links west of the city of Warendorf at the entrance to the town via a roundabout to Landesstraße 830 / "Milter Straße".

The planned third construction phase represents the final construction phase in the realization of the planned northern city street in the north of the city of Warendorf. The third construction phase serves to fill the gap and connects the sections already built in the connection area Landesstraße 830 / "Milter Straße" with the connection to the federal road 64 over the existing street "Hellegraben".

When planning, the results of the species protection report, the species protection test and the FFH compatibility test etc., as well as all documents specified in the appendix, must be taken into account.

Download full details as .pdf
The Buyer:
Stadt Warendorf
CPV Code(s):
71300000 - Engineering services
71320000 - Engineering design services
71327000 - Load-bearing structure design services