The municipality of Belm is planning the extension and conversion of the Belm secondary school.
The subject of this award procedure is the tile, slab and cast stone work required for the construction project.
The construction work to be awarded is divided into the following construction phases:
1st construction phase “Extension of the secondary school”
The execution for the first construction phase is planned for the period from week 46 2023 - 08 week 2024.
The new building consists of:
ground floor = level 0
1st floor = level 1
2nd upper floor = level 2
with various rooms, for example:
- Level 0: classrooms, canteen, cleaning supplies, toilets, technical rooms, stairs, elevator
- Level 1: classrooms, stairs, lift, technology, cleaning supplies
- Level 2: classrooms, stairs, lift, technology, cleaning supplies
Net room areas:
Level 0 approx. 1,296m2
Level 1 approx. 1,396m2
Level 2 approx. 716m2
Total: approx. 3,408 m2
2nd construction phase “Conversion of teacher and administration area as well as reconstruction of fire protection measures and elevator on levels 0 to 2 of the secondary school”:
The tile, slab and cast stone work provided for this purpose takes place at different times and on different levels. Since some rooms in the existing building will continue to be used by teachers and students during the renovation work, the work will always be carried out in close coordination with the school management. The entire construction work is expected to take place between CW 38 2024 and CW 40 2025. The contractor must be available for all assignments at short notice (max. one week's lead time).
Since the "extension of the secondary school" will not be built as a completely free-standing building, but will be connected to and into the existing building on the various levels, tile, slab and cast stone work must also be partially carried out in the transition areas of the existing building as part of the extension.