The acquisition is subject to the construction of a 110 kV transmission line (c. 55 km) as a KVR works fully operational condition. The acquisition additionally includes the acquisition and delivery of materials. The management is located in the cities of Äääkoski and Viitasaari. The transmission line rakka consists of the lead sections Koivisto-Kuhnamo, Kuhnamo-Konginkangas and Konginkangas-Viitasaari.
The transmission line is implemented as a 2-Duck transmission line, with a predominantly harussed column structure. The current management will be dismantled in the construction work and the new management will be built on the site of the The delivery includes all work on the dissolution of the current management. Construction works shall be designed in such a way that the total duration of the interruption is as short as possible. The transmission line will be built in more parts. Pre-and general design material for the transmission line will be provided during the procurement process.
The contract is based on the general contract terms of the works under the changes agreed during the procurement process YSE1998. The Selected Contractor undertakes to serve as the principal contractor, principal executor, site management obligation and site services contractor.
The acquisition is subject to the construction of a 110 kV transmission line (c. 55 km) as a KVR works fully operational condition. The acquisition additionally includes the acquisition and delivery of materials. The management is located in the cities of Äääkoski and Viitasaari. The transmission line rakka consists of the lead sections Koivisto-Kuhnamo, Kuhnamo-Konginkangas and Konginkangas-Viitasaari.
The transmission line is implemented as a 2-Duck transmission line, with a predominantly harussed column structure. The current management will be dismantled in the construction work and the new management will be built on the site of the The delivery includes all work on the dissolution of the current management. Construction works shall be designed in such a way that the total duration of the interruption is as short as possible. The transmission line will be built in more parts. Pre-and general design material for the transmission line will be provided during the procurement process.
The contract is based on the general contract terms of the works under the changes agreed during the procurement process YSE1998. The Selected Contractor undertakes to serve as the principal contractor, principal executor, site management obligation and site services contractor.