The subject of the contract is the delivery and installation of biomass boilers in the Trawniki Municipality.
The order is implemented as part of the projects entitled "Support for climate in the Municipality of Trawniki I" and "Support for climate in the Municipality of Trawniki III" co-financed from EU funds under the Regional Operational Program of the Lubelskie Voivodeship for the years 2014-2020, priority axis 4 Environmentally friendly energy, action 4.1 Support for the use of RES.
The subject of the contract includes the supply and installation of biomass boilers in private buildings in the Trawniki municipality:
1)48 pcs. boilers with a capacity of 15 kW, including:
- 5 pcs. overhead (integrated)
- 43 pcs. with boiler tank
2)48 pcs. boilers with a capacity of 20kW with a boiler tank.
The subject of the contract includes the supply and installation of biomass boilers in private buildings in the Trawniki municipality:
1) 48 pcs. boilers with a capacity of 15 kW, including:
- 5 pcs. overhead (integrated)
- 43 pcs. with boiler tank
2) 48 pcs. boilers with a capacity of 20kW with a boiler tank.
4. Scope of the Contractor's duties:
1) dismantling of the old boiler and installation elements that will be replaced (transfer to the Owner)
2) installation of boiler, fittings and equipment, thermal insulation of pipelines in accordance with technical documentation, applicable legal, construction and technical conditions
3) delivery and connection of the Internet module with the necessary equipment (e.g. wiring)
4) delivery and installation of a wireless room regulator
5) installation of the control system
6) delivery and installation of central heating pump, mixing valve with actuator, proper protection of the installation
7) delivery and installation of the DHW pump and connection of the DHW tank.
8) installation of a flue with a cleaner and connecting the boiler to the existing chimney flue
9) connection of the boiler to existing central heating, z.w.w., dh.w.u. installations within the room where the boiler was installed to the extent necessary for the proper functioning of the installation in automatic mode in accordance with the technical documentation.
10) performing rinsing, pressure tests of installations
11) filling, venting and commissioning of the installation
12) commissioning and participation in the technical acceptance of the installation
13) providing instructions and training of the User in the correct and safe operation of the installation and its maintenance
14) replenishment, sealing of cavities after passages of wires
15) providing the Ordering Party with the protocol of boiler room acceptance, training and transfer of documentation confirming the acceptance and familiarization with its content by the User