Energy-efficiency consultancy services | Tenderlake

Energy-efficiency consultancy services

Contract Value:
-
Notice Type:
Contract award notice
Published Date:
23 March 2023
Closing Date:
Location(s):
UKD1 Cumbria (UK UNITED KINGDOM)
UKD7 Merseyside (UK UNITED KINGDOM)
UKI LONDON (UK UNITED KINGDOM)
Description:
SHDF Retro Consultant

This consultant appointment is key to that and we are looking for a consultant who truly

wants to work collaboratively with us to share knowledge and support us in increasing our inhouse

capabilities through a flexible approach. As we recruit staff and refine the project,

needs may change and we will have open dialogue with you about progress from both sides,

as well as any change in scope and approach.

Given the scale of the assessments being delivered, we expect to see economies of scale,

particularly as the area based approach should mean repetition of very similar properties and

the ability to reduce travel times by carrying out surveys in constrained area within a single

day.

As Retrofit Coordination requires regular on-site presence we will work with you at the

earliest stages to develop our programme and identify those tranches to go first which will

require an external RC to help you to resource this.

The Riverside Group (TRG) have made a significant commitment to improving the energy

efficiency of our homes. We have a target of bringing all our homes up to a minimum of EPC

Band C by 2030 and to net zero carbon by 2050. We aim to :

? reduce the contribution to climate change that our homes make,

? protect our residents from rising energy costs

? enable our residents to heat their homes to guideline temperatures

? improve indoor air quality

? eliminate damp and mould.

TRG have applied for SHDF funding to take 1100 properties up to EPC Band C. We have

carried out a number of surveys already, some of which found properties were already at a C

and this is informing our data improvement. The project consists of approximately:

? London ? 150 (1 tranche)

? Carlisle ? 150 (1 tranche)

? Liverpool ? 800 (3 / 4 tranches)

The size of each tranche and distribution between the areas will be refined as surveys are

returned.

Whilst the driver for this project is to deliver SHDF funding, TRG will be taking an area based

approach so may include properties that are funded through other sources or where works

are minor, funded solely by TRG. If we are unsuccessful in SHDF funding, we will still proceed

with a project at approximately 50% and we will work with you to scope this ?fallback?

project so that resources are not wasted on work that may not be taken forward.

Given the SHDF timescales some activities will happen concurrently. For example, we will

expect to move to immediately surveying properties, at the same time, you will review our

wider eligible properties to produce a total survey list.

Similarly, surveys will still be taking place as our contractor mobilises in March and April and

there will be an opportunity to work with the contractor at this stage.

We will stagger the start of tranches in discussion with the contractor and in response to

resident engagement.

Awarded to:
SHDF Retro Consultant
Constructive Thinking Studio Limited, Liverpool (UK)
Download full details as .pdf
The Buyer:
The Riverside Group
CPV Code(s):
71314300 - Energy-efficiency consultancy services